Achieving Designed Production Target

After stabilized and smooth operation of blast furnaces, sintering plants, pellet plants and coking plants is achieved, MSS provides technical services for achieving designed or even higher productivity. Such technical services mainly include: preparation of plan for achieving designed productivity, raw material and fuel adjustment plan, plan for adjustment of utilities such as blast, electric power and water, furnace operation system adjustment plan, equipment operation intensifying plan, operator post operation system and equipment maintenance system adjustment plan, incident prevention and treatment plan, designed productivity time schedule, and also inspection of execution of all the above listed plans. After achieving the planned targets, technical supports will be continued for seven to ten days more.